Heinz
Pittsburgh, PA
Technology design and construction management for the Heinz Jet
Hanger at the Greater Pittsburgh International Airport. This
included VoIP telephony, 802.11n wireless, security (video and
access), and data networks.
Managed the relocation of all IT assets and services during the
relocation of the World Headquarters in Pittsburgh, PA in
2008.
Designed and managed the implementation of a new PBX, Voice Mail
and Cable Distribution System for Heinz World Headquarters legal
staff when they moved to the CNG Tower in Pittsburgh, PA. All
voice and data systems were designed to operate seamlessly with
the new systems installed at World Headquarters in 1998. All
equipment is being certified as Y2K compliant.
Designed and managed the implementation of a new PBX, Voice Mail
and Cable Distribution System for Heinz World Headquarters in
Pittsburgh, PA. Heinz was a Centrex customer and occupies two
floors of the USX Tower that has a floor trench distribution
system for cable. The amount of abandoned cable in the trenches
required the new PBX to be cut onto existing wiring. The floors
were then broken into sections with all old cable being removed
and replaced with new Cat-5 wire. Four new rooms were designed
and constructed (MDF and IDFs), and new network Electronics for
data distribution were bid and installed during this project.
All equipment is being certified as Y2K compliant.